Your payback, conservative case
18-month kill line
—
Annual savings, conservative case
Savings by problem
Send the full report
The rest of your report is ready. It includes:
- Three-year cash flow, year by year
- NPV at 10% and three-year ROI
- Conservative, expected, and aggressive scenarios
- 30/60/90 kill criteria for each of your three problems
- Which tool to test first for each problem
- PDF you can hand to your GM
Full report
Three-year cash flow
| Year | Savings | Cost | Net | Cumulative |
|---|
—
NPV at a 10% discount rate
—
Three-year ROI
Your 30/60/90 kill criteria
Miss a checkpoint, stop the pilot. Walking away early is a win, not a failure.
Why these numbers hold up
Built from plant floors, not pitch decks
30+ years in manufacturing at Eli Lilly, Nestle, Braskem, and Tate & Lyle. The factors come from real project history.
$65M+ in capital projects managed
Overrun rates and ramp times in this model match what capital projects do in practice, not in proposals.
11 AI tools tested against plant work
Every tool recommendation in your report was tested on real downtime logs, quotes, and procedures.
Pricing questions? Request a quote.